Wednesday, 21 October 2020
3D-P launch Osprey Intelligent Endpoint®

3D-P launch Osprey Intelligent Endpoint®

Original article published by 3D-P

Did you know that the capabilities of your LTE clients are as critical as the design of your wireless network when it comes to the performance of LTE in the mining environment?

As a systems integrator with 25 years’ experience in mining, 3D-P has recently launched the 3D-P Osprey Intelligent Endpoint® – a rugged, purpose-built device that can handle the rigors of installation on mining equipment, while tackling a whole host of new challenges presented by LTE technologies in this environment.

CHALLENGE #1: HARDWARE SELECTION

A number of best practices should be followed when selecting your LTE client. Beyond ruggedness, ensure that your LTE client supports the uplink requirements of your mobile applications. LTE typically faces a physical challenge through the availability of a single transmit antenna, this might be a problem on a haul truck, resulting in significant antenna blockage.

3D-P has designed the Osprey to integrate an RF switch allowing the UE to transmit on whichever antenna has the greatest signal quality.

ACCESS DATASHEET


CHALLENGE #2: L3 CONNECTIVITY

Many legacy mining applications require L2 connectivity, however LTE is a L3 technology. Tunnels or other solutions must be deployed in order to resolve this challenge, and management of those solutions through drops in coverage, roaming between Wi-Fi and LTE networks, can be particularly challenging.


3D-P has developed several solutions to help overcome these challenges. For example, the hybrid LTE/InstaMesh® Osprey allows the creation of a tunnel within InstaMesh to pass the data over the L3 link and back to the local network.

 

Discover how the Hybrid LTE/InstaMesh Osprey guarantees performance of your LTE deployment. 

To discuss how the Osprey product line can help you improve performance of your LTE deployment, contact us today


Image

1021
«October 2020»
MonTueWedThuFriSatSun
2829
29/09/2020 12:00 PM - 2:00 PM
7486

CEO Leadership Luncheon: Chris Walsh, Chief Commercial Officer, Idemitsu (EVENT FULL)

Location: Hotel Grand Chancellor Brisbane, 23 Leichhardt Street, Brisbane, QLD

Read more
30
30/09/2020 12:00 PM - 2:00 PM
7499

CEO Leadership Luncheon: Penny Dent, Head of Technology WAIO, BHP (EVENT FULL)

Location: Optus Stadium, Victoria Park Drive, Burswood WA, Australia

Read more
1234
567891011
1213141516
16/10/2020 4:00 PM - 5:00 PM
1718
19
19/10/2020 1:00 PM - 2:00 PM
202122
22/10/2020 12:30 PM - 1:30 PM
232425
2627
27/10/2020 4:00 PM - 6:00 PM
7567

Smart Mining Networking Event: Mining's Renewable Future

Location: Optus Stadium, 333 Victoria Park Drive, Burswood, WA

Read more
28
28/10/2020 11:30 AM - 12:30 PM
2930311
2345678

Filter Events

Filter:

Filter by Categories


Reset Filter

GET SOCIAL

SUBSCRIBE to our newsletter

Loading

Austmine

 

OZ METS Hub

WonderWebs.comTerms|Privacy|Copyright © 2020 Austmine | Mining Equipment, Technology and Services (METS) Sector
Back To Top