Sunday, 24 February 2019
Case Study: Optimising Payload Performance

Case Study: Optimising Payload Performance

Payload management plays a large role in meeting production requirements and keeping a fleet operating efficiently. Poor payload management, has a direct impact on productivity. Overloading beyond payload limits risks machine durability, whereas underloading introduces severe production losses.

The purpose of this study was to assess operational payload performance on a site that had recently implemented iVolve’s Load Assist capability.
A baseline level of payload performance was recorded prior to iVolve implementation.

Once operators and management were properly trained, data was collected over a two-month period tracking the improvements made in payload management.

The site used Liebherr 9350’s loading 789C’s with overburden material and, to be included in the study, required to have a count of more than 10 loads in a shift.

VIEW THE CASE STUDY IN THE RELATED DOCUMENTS BELOW.

Image

Related Documents

551
«February 2019»
MonTueWedThuFriSatSun
28293031123
45678910
11121314151617
18
18/02/2019 4:00 PM - 5:00 PM
6175

Austmine Networking Drinks at Coal 2019

Location: McKinnon Building, 67, UOW

Read more
19
19/02/2019 4:00 PM - 6:00 PM
6072

Gold Fields Smart Mining Networking Event

Location: Mercure Perth, Irwin Street, Perth WA, Australia

Read more
2021222324
25262728
28/02/2019 4:00 PM - 6:00 PM
6183

Contractors Panel Smart Mining Networking Event

Location: Rydges World Square, 389 Pitt St, Sydney NSW 2000

Read more
123
45678910

Filter Events

Filter:

Filter by Categories


Reset Filter

GET SOCIAL

SUBSCRIBE to our newsletter

Loading

Austmine

 

OZ METS Hub

WonderWebs.comTerms|Privacy|Copyright © 2019 Austmine | Mining Equipment, Technology and Services (METS) Sector
Back To Top