Technology Trial Improved Productivity by 5%

Technology Trial Improved Productivity by 5%

This was originally published by iVolve.

Challenge

A global lime and limestone company wanted to increase productivity and reduce cost, and realised that to do that they needed to move away from their paper-based system and start measuring actual numbers with a Fleet Management System (FMS). The time between collecting data and analyzing it was taking upwards of 18-24 hours, too long and inaccurate for any significant improvements to be made. iVolve’s FMS solution was installed as a 2-year pilot program at a limestone mine in the USA to demonstrate how a large-scale FMS collecting production and maintenance information from across the site could improve the fleet metrics and deliver business value. 

Method

A baseline level of performance was recorded prior to the iVolve deployment. The iVolve FMS was then installed on a CAT 992 wheel loader, two CAT 990 wheel loaders, and four CAT 777 trucks.

Operators were shown how the iVolve system gave them instant feedback in the cab so they knew they were getting maximum productivity on each load. Dispatch and management were shown how to use the iVolve system dashboards and reporting functionality to plan, oversee, and report on each shift to maximise efficiency.

"When the system went down and the operations didn't have feedback, I saw our tonnage fall from 99 tons to 95." - Mine Engineer.

Findings

Significant cost reductions were made at site over the seven months (calculations based on standard shift calender time), as illustrated in the table below. 

Image

The potential productivity figure was based on the site’s ability to make further improvements to productivity and cycle times. Before the iVolve FMS was installed, the tonnage was averaging at 95. After installation, the target was set at 105 tons. At the time of calculation, the payload had increased to 99 tons, leaving room for further improvement.

The iVolve FMS was initially scoped to have a return on investment in 2 years. Actual return on investment was achieved in under a year. 

To download the full white paper, which includes further information about additional benefits and solution, please visit iVolve's website.

Image

1456

Theme picker

«September 2020»
MonTueWedThuFriSatSun
31123456
78910111213
14151617
17/09/2020 4:00 PM - 6:00 PM
7477

Smart Mining Networking Event: Bengalla Mining | CLOSED

Location: Rydges Newcastle, Wharf Road and Merewether Street, Newcastle, NSW

Read more
181920
21
21/09/2020 1:00 PM - 2:00 PM
2223
23/09/2020 4:00 PM - 6:00 PM
7513

Smart Mining Networking Event: BHP

Location: Optus Stadium, 333 Victoria Park Drive, Burswood, WA

Read more
2425
25/09/2020 3:30 PM - 5:00 PM
2627
2829
29/09/2020 12:00 PM - 2:00 PM
7486

CEO Leadership Luncheon: Chris Walsh, Chief Commercial Officer, Idemitsu (EVENT FULL)

Location: Hotel Grand Chancellor Brisbane, 23 Leichhardt Street, Brisbane, QLD

Read more
30
30/09/2020 12:00 PM - 2:00 PM
7499

CEO Leadership Luncheon: Penny Dent, Head of Technology WAIO, BHP (EVENT FULL)

Location: Optus Stadium, Victoria Park Drive, Burswood WA, Australia

Read more
1234
56
6/10/2020 12:00 PM - 1:15 PM
7891011

Filter Events

Filter:

Filter by Categories


Reset Filter

GET SOCIAL

SUBSCRIBE to our newsletter

Loading

Austmine

 

OZ METS Hub

WonderWebs.comTerms|Privacy|Copyright © 2020 Austmine | Mining Equipment, Technology and Services (METS) Sector
Back To Top