This was published on PETRA Data Science.

In 2018, a MAXTA digital twin model was deployed at PanAust’s Ban Houayxai gold-silver operation in northern Laos to predict gold recovery. 

Note: This article contains excerpts from the AusIMM Complex Orebody 2018 conference extended abstract and presentation by Carpenter J, Scott, C, Stewart, P.C., Jones, E. and Offer, A. C 2018 Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation. AusIMM Complex Orebody Conference 2018, Paper Number 38, Brisbane.

The operation mines an epithermal gold-silver deposit with intermediate sulphidation which is hosted in an early Permian volcano-sedimentary unit(Manaka et al, 2014Carpenter et al, 2018). This is part of a volcanic-plutonic sequence of the Truong Son Fold Belt formed during the late Carboniferous to early Permian periods, around 310-270 million years ago.  

The operation comprises an open pit that feeds ore to a conventional carbon-in-leach process plant. Metallurgical recoveries for gold and silver are 75-85% and 55% respectively, and the mine produced 0.65Moz of gold and 4.7Moz of silver during 2017.  

Tackling poor recovery 

Ban Houayxai was experiencing infrequent episodes of very poor gold recovery (less than 50%) due to low head grades and high gold content in its tailings. A large proportion of the gold is locked in sulphide and silicate minerals and head grades vary from 0.6 to 1.6g/t of gold, with an average grade of 0.8g/t.  

In order to improve recovery and optimise it’s processes for future variations in ore feed, not just from different mining areas but also from stockpiles and multiple working faces, the mine needed to predict if or when these episodes might occur.  

Enter MAXTATM  

Petrographic and geochemical studies had failed to identify properties that would allow the discrimination of poor recovery areas, so PanAust turned to PETRA and its MAXTATM software.  

MAXTATM is the world’s first digital twin for mine value-chain optimisation. The digital twin model draws upon historical data to predict plant performance, and so was a good choice for the Ban Houayxai project.  

The geological data required to train the digital twin model was obtained fromtwo years, or 10Mt of ore that was analysed between March 2016 and March 2018. This period coincided with the mining and processing of fresh, un–weathered ore that seemed to be associated with poor gold recovery.  

This was combined with gold measurements from 1,211 composite tailings samples taken from the processing plant. 

The PETRA team integrated the data into the MAXTATM software to create a prediction model that was applied to the mine’s block model, allowing both historical reconciliation analyses and future predictions to be made. 

Results 

The program was successfully completed in eight weeks, and determined that the following conditions lead to high levels of locked gold and poor recovery: 

  • High zinc grades; 

  • High acid–neutralising capacity (carbonate veins); 

  • Low copper and lead grades; 

  • High silver grades; and

  • Fresh rocks. 

A graph of the predicted versus actual tailings gold grade can be seen below. 

Image

The MAXTATM model has now been used to identify feed that could be problematic for gold recovery. It has also been tested to provide both a direct estimate of the tailings gold grade, as well as the probability that a block will have a high tails grade.  

The benefit of this approach is that it quantifies mining risk, providing numbers that can be used in cost improvement studies, analyses and ‘what if’ simulations for various scenarios. It also helps to justify resource allocation and develop strategies for the amelioration of negative events such as breakdowns.   

Image

Life of Mine (LOM) location of high tails material at Ban Houayxai (after Carpenter et al, 2018, presentation to the AusIMM Complex Orebody Conference, Brisbane 2018).

Other deployments

Since completing the digital twin work with PanAust, MAXTATM has been deployed across iron-ore, copper-gold, and gold operations globally. In addition to the geometallurgy applications for recovery and throughput prediction, MAXTATM digital twin prediction, simulation and optimisations deployments include:

  • Drill and blast simulation and optimisation to maximise crusher throughput and availability

  • Copper and gold recovery optimisations (real-time operational decision suppport)

  • Drill and blast simulation and optimisation to maximise SAG mill throughput

  • Gold tailings grade prediction six hours in advance

MAXTA digital twin deployments are fast to generate value.

PETRA CEO, Dr Penny Stewart explains, “PETRA is investing heavily in value chain integration by developing application programming interfaces (APIs). APIs are a fast to value way to achieve interoperability. These API’s enable our platform agnostic solutions to be deployed very quickly. For example; downstream in the processing plant, our APIs cross the IT-OT divide.  Real-time MAXTA recovery optimised set points are visible in systems metallurgists and operators already use as part of their every day workflow. 

Additionally, we recently completed integrations that enable MAXTATM models to be deployed seamlessly into Maptek Vulcan 3D mine planning environment. This integration means it takes just minutes to deploy digital twin geometallurgy models into operations from Vulcan.  Leveraging existing systems and platforms is key to the successful operational uptake of our machine learning and optimisation solutions.” 

For more information please contact us on info@petradatascience.com or reach out via our contact page.

Print
94
Previous Article Rainy Days for FIFO Workers - If You Fail to Plan, You Plan to Fail
Return
Next Article Nuclear Power vs Climate Change (As told by Green Eggs & Ham)

Theme picker

Austmine Programs

All Programs

Austmine Publications

All Publications

GET SOCIAL

SUBSCRIBE to our newsletter

Loading

Austmine

 

OZ METS Hub

WonderWebs.comTerms|Privacy|Copyright © 2019 Austmine | Mining Equipment, Technology and Services (METS) Sector
Back To Top